Have Department Assignment in TS drive Labor Allocation in TWP
If using the Standard Scheduler in TWP, we can add a "Place" to each scheduled shift. Then, using the reportingdate.schedplace variable, we can assign that Place or Department number to the actual shift on the timesheet. The capability to drive an...